SOFTWARE / INFRASTRUCTURE / SECURITY / KENYA
Done
Action completed
Case Study Wireless Networking & ISP Solutions Point-to-Multipoint Networks Intermediate • 6 min read

How to connect multiple buildings using wireless links

P Author: Peter Mwangi (Senior Network & Field Infrastructure Engineer)
Reviewed by: Lawrence Kamau (Lead Systems Architect & Infrastructure Engineer)
Published: May 1, 2026 • Last Updated: Nov 22, 2026 • Target Hardware: Cambium ePMP Force 300 / ePMP AP and Ubiquiti airMAX AC with managed VLAN switches.

Purpose: Interconnect a headquarters building with two or more remote campus blocks, warehouses, or gatehouses using a hub-and-spoke PtMP or dedicated PtP topology.

Reference Network Topology
Point-to-Multipoint (PtMP) Tower Distribution with Management & Customer VLAN Separation
NODE 01
POP Core Router & Backhaul
MikroTik CCR/RB router fed via licensed/5GHz PtP backhaul
NODE 02
Tower Managed Switch
PoE switch isolating VLAN 99 (Radio Mgmt) from VLAN 120 (Subscriber Traffic)
NODE 03
Sector / Horn Access Point
Cambium ePMP AP or Ubiquiti Rocket Prism 5AC (GPS Sync / TDD)
NODE 04
Multiple Subscriber Modules (SMs)
Cambium Force 300 / Ubiquiti NanoStation & PowerBeam CPEs
NODE 05
Customer Premise Routers
Authenticated via PPPoE / DHCP Option 82 with per-plan rate limits

Prerequisites

  • Central roof/mast with line of sight to all remote buildings and managed switches at each site.

Step-by-Step Configuration

STEP 01 — Choose Hub-and-Spoke PtMP vs. Dedicated PtP

If 3+ buildings sit within a 90° arc from HQ, mount one central sector AP at HQ and directional CPEs on each block. For high-bandwidth server/CCTV links, use dedicated PtP pairs.

STEP 02 — Extend Corporate & Security VLANs via 802.1Q Trunks

Tag Staff, VoIP, CCTV, and Management VLANs across the wireless links into managed switches at each building.

STEP 03 — Plan Power Autonomy & Surge Protection

Install local UPS units and grounded Ethernet surge protectors at every rooftop radio entry point.

Expected Results & Verification

All buildings share central ERP servers, NVR surveillance recording, IP telephony, and redundant HQ internet on one shared network.

Troubleshooting Matrix

Issue:
Fix:
SECURITY HARDENING

Isolate gatehouse/perimeter CCTV switches onto a dedicated VLAN so outdoor Ethernet jacks cannot reach corporate finance servers.

BACKUP & RECOVERY

Maintain a campus topology diagram showing each building switch, radio IP, and wireless frequency.

P
Peter Mwangi Delight Engineering Team
Senior Network & Field Infrastructure Engineer
Specialization: Cambium ePMP, Ubiquiti airMAX, Fiber GPON / SFP+ Distribution & Tower Rigging

Leads physical wireless and optical deployments across Dagoretti South and greater Nairobi, specializing in interference mitigation and high-throughput point-to-point links.

Tested on Delight Living ISP Network (YouBroadband)
Nairobi NOC • Kabiria Road, Dagoretti South
Related Technical Guides
Was this engineering guide helpful?
Need professional installation, auditing, or troubleshooting? Request Network Consultation →